|
Wednesday, 31 January 2007 00:00 |
|
To improve the resilience of the network and increase the available bandwidth of the Internet connection, Northern Grid have commissioned the installation of multiple backup links at core level creating a resilient ring for all LAs.
An additional POP has been created at Newcastle with symmetrical firewall clustering to the Middlesborough POP. The available bandwidth has been upgraded from 155M to 200M.
Files to Download
| File | Description | File size |
Download document | Northern Grid Core Network Upgrade | 31 Kb |
|